1.000 MW
Max. capacity
14-15 MW
Turbine Type
67-72 WTG
Number of WTG
Monopile
FOU concept
Offshore & Onshore
Substations
Onshore
Grid connection
28 metre
Water depth (average)
Good
Soil condition
25 km
Distance to shore
10.1 m/s
Wind speed (average)
1 million
How many household?
100% by RWE
Owner